EOI - Consultancy LAMATA- Orange Line - Lagos - Nigeria - AfDB
The study phase of an important urban train project supported by the UMDF, is about to start!
The Lagos Metropolitan Area Transport Authority (LAMATA), with the support from the African Development Bank (AfDB), intends to implement The Orange Line Rail. This project constitutes one of the six rail lines recommended in the Lagos Strategic Transport Master Plan (LSTMP, 2014). The study aims to the assess the feasibility of the 48 km rail project, encompassing the development of essential infrastructure, including electrified rail tracks, seventeen stations and a depot.
-----------
Consultant type: Firm Consultant
Consultant Location: Home Based
Publication date:20-Jun-2024
Closing date: 05-Jul-2024
Job family: Private Sector, Infrastructure and Industrialization;
The consultant will prepare a detailed feasibility study for the Orange line and build on the work already undertaken by the LAMATA, the The Lagos Strategic Transport Master Plan (LSTMP). The consultant activities will focus on accumulating data, conducting analysis, completing planning and design work for an efficient rail system. The Detailed feasibility Report (DFR) will be prepared in two stages. The first stage will include a demand assessment, concept plan, service plan, and impact analysis, enabling a preliminary appraisal of the system. In the next stage, the consultant will prepare detailed infrastructure plans including physical designs and construction cost estimates. The end product will be a viable proposal to enable successful implementation of all elements of the orange line.